ARSAG WINTER MEETING

Working Groups / Leads

7 - 9 February 2017

Document / Project Managers

Hotel Information

Holiday Inn Dayton/Fairborn

 

Address:

2800 Presidential Dr, Fairborn, OH 45324

 

Phone:

(937) 426-7800

 

Website

  Working Groups / Leads

Group 1:

Boom/Receptacle Components & Verification Methods

Eric Pepple, AFLCMC/WKE

Antonio Cano-Gonzalez, Airbus

Jim Reinholdt, Eaton

TBD, Parker Aerospace

 

Group 2:

Probe/Drogue Components & Verification Methods

Tom Cavallaro, NAVAIR

Jim Turner, Products Support

Stephanie NeCamp, AFLCMC/WKE

Jim Reinholdt, Eaton

Josh Tokarz, AFLCMC/EZFA

 

Group 3:

Formation Aids, Markings and Lighting

John Luu, AFLCMC/WKE

Derek Ferwerda, NAVAIR

 

Group 4:

Maintenance and Ground Support Equipment

Nick Dicandia, Lockheed-Martin

John Linville, Lockheed Martin

Jim Turner, PSI

Maj Andrew Nye, AFLCMC/WKDA

Stuart Cousineau, USAF

Wes Durant, OC-ALC

John McDermott, Cobham

 

Group 5:

Clearance Processes and Procedures

Tom Swiderek, Omega Air

Maj Victoria Thomas, USAF JAPCC NATO

T. J. Pitsor, AFLCMC/EZFA

Maj James Sprys, USTRANSCOM

 

Group 5A:

Automated Aerial Refueling

Steve McLaughlin, NAVAIR

Ba Nguyen, AFR/RQQC

 

Group 6:

Systems Requirements & Verification Methods

Rob Tipton, Lockheed Martin

Harry Slusher, Boeing

Derek Ferwerda, NAVAIR

Sean Martin, Boeing

Mark Shelly, Boeing

Document Review Team (DRT)

DRT Lead to be named

Bruno Martinez, Airbus Military

Rob Tipton, Lockheed Martin

Steve McLaughlin, US Navy

Laurent Beyneix, French MoD

Group Leads

  Document / Project Managers

Group 1:

Boom/Receptacle Components & Verification Methods

Boom Nozzle Specification

Eric Pepple, AFLCMC/WKCE

 

Receptacle Specification

TBD

 

Group 2:

Probe/Drogue Components & Verification Methods

Coupling Specifications MA-5

Stephanie NeCamp, AFLCMC/WKE

 

Coupling Specifications, MA 2, 3, 4

Tom Cavallaro, NAVAIR

 

Probe Nozzle Specification

TBD

 

Drogue Specification

TBD

 

Group 3:

Formation Aids, Markings and Lighting

Formation Aids Guide Document

John Luu, AFLCMC/WKE

 

Hose Markings

Derek Ferwerda, NAVAIR

 

Group 4:

Maintenance and Ground Support Equipment

Maintenance Guide Document

Nick Dicandia, Lockheed Martin

 

Ground Support Equipment Guide

Jim Turner, Products Support

 

Procurement Matrix

John McDermott, Cobham

 

Group 5:

Clearance Processes and Procedures

AR Clearance Initiation Request

Tom Swiderek, Omega Air

Dex Kalt, ARSAG Exec. Dir.

 

Clearance Process Document

Maj. Victoria Thomas USAF JAPCC/NATO

 

Clearance Point Paper

Maj James Sprys, USTRANSCOM

 

Standardized Technical Data Survey (STDS) 2nd Five-Year Review

Jacob Benscoter, CASS

Dex Kalt, Exec. Dir. ARSAG

 

Interface Data Acquisition

Tom Swiderek, Omega Air

Dex Kalt, ARAG Exec. Dir

 

Group 5A:

Automated Aerial Refueling

Con Ops Document

Steve McLaughlin, NAVAIR

Ba Nguyen, AFR/RQQC

 

Group 6:

Systems Requirements & Verification Methods

ARSAG STANAG 3447 Ed 5 with Drawing Revisions

Rob Tipton, Lockheed Martin

Derek Ferwerda, NAVAIR

 

Probe and Drogue Guide Document

Derek Ferwerda, NAVAIR

 

Boom Receptacle Guide

Harry Slusher, Boeing

 

Pressure Definitions, Terms & Verification 2nd Five-Year Review

Mark Shelly, Boeing

 

STANAG 7191 Revisions

Harry Slusher, Boeing

 

Aerial Refueling Test Methods Guide Document

Rob Tipton, Lockheed Martin

Follow Us on Facebook

Copyright © 2017 ARSAG Inc. All rights reserved